Big Six Towers

Rental Generator & Engine #6 Testing

To:      Big Six Towers Residents

From: Management

Date:  November 5, 2024

Re:     Rental Generator & Engine #6 Testing

Dear Residents,

Management would like to notify you that on Wednesday, November 6th, 2024 a team will be on site to begin disconnecting the rental generator located outside of the Power Plant. This step is necessary to facilitate the planned use of Engine #6, which we anticipate bringing into operation on Thursday, November 7th, 2024. Engine #6 has recently undergone repairs, and we aim to run it continuously to assess its reliability and performance. Given the cooler season coming up, we are preparing to phase out the rental generator, provided that Engine #6 operates as expected. There is a possibility of a brief power outage if Engine #6 was to fail and would like everyone to be prepared, however we do not anticipate any issues.

Please note that if Engine #6 encounters issues shortly after being put into use, we may need to retain the rental generator as a standby backup.

As always, we would like to remind everyone of the necessity of checking your medical back up equipment, if this pertains to you. Please make sure that your equipment is properly working and charged on a periodic basis.

A one call message will be sent out right before we are ready to turn Engine #6 on.

Thank you all for your continued cooperation.

Rental Generator and Engine #6 Testing Memo